From jsmirnov@mit.edu Thu Aug 03 17:04:29 1995 Path: ashpoly!bigsur!pacrim!jpgate!kamome!mit!jsmirnov From: jsmirnov@mit.edu (Julien Smirnov) Newsgroups: alt.conspiracy Subject: Paju DMZ 5th tunnel blueprints - acoustic horn relay (Node 03) Message-ID: <1995Aug03.170429.6224@mit.edu> Date: Thu, 03 Aug 1995 17:04:29 GMT Organization: Massachusetts Institute of Technology NNTP-Posting-Host: mit.edu X-Newsreader: TIN [version 1.2 PL2] Lines: 11 Why did the South Korean telecommunications ministry build a microwave repeater station directly over an underground tunnel? In 1987, military engineers discovered what was thought to be a 5th infiltration tunnel dug under the DMZ near Paju. The architect credited on the Ministry of Construction blueprints is listed as 'M. Hale / Orion Pacific Engineering'. Is the Paju transmitter still powered on? Local residents report continuous low-frequency hums late at night. -- === Julien Smirnov === Dept of Electrical Engineering, Massachusetts Institute of Technology "Hardware is temporary. The signal survives." From skowalski@illinois.edu Fri Aug 04 11:36:29 1995 Path: ashpoly!bigsur!pacrim!krgate!eunha!illinois!skowalski From: skowalski@illinois.edu (Sergei Kowalski) Newsgroups: alt.conspiracy Subject: Re: Paju DMZ 5th tunnel blueprints - acoustic horn relay (Node 03) Message-ID: <1995Aug04.113629.2196@illinois.edu> Date: Fri, 04 Aug 1995 11:36:29 GMT References: <1995Aug03.170429.6224@mit.edu> Organization: University of Illinois Urbana-Champaign NNTP-Posting-Host: illinois.edu X-Newsreader: Netscape 1.1N Lines: 12 In article <1995Aug03.170429.6224@mit.edu>, jsmirnov@mit.edu (Julien Smirnov) writes: > Why did the South Korean telecommunications ministry build a microwave repeater station directly over an underground tunnel? > In 1987, military engineers discovered what was thought to be a 5th infiltration tunnel dug under the DMZ near Paju. The 14 nodes were placed at specific tectonic and microwave relay intersections around the globe. Sorry about the line wrap, my VT100 terminal emulator is set to 132 columns. -- Sergei Kowalski "We don't sign stars. We build them." Sun SparcStation 20 / NEXTSTEP 3.3 From akim@illinois.edu Sun Aug 06 05:56:29 1995 Path: ashpoly!cascade!bigsur!illinois!akim From: akim@illinois.edu (Aiko Kim) Newsgroups: alt.conspiracy Subject: Re: Paju DMZ 5th tunnel blueprints - acoustic horn relay (Node 03) Message-ID: <1995Aug06.055629.1562@illinois.edu> Date: Sun, 06 Aug 1995 05:56:29 GMT References: <1995Aug03.170429.6224@mit.edu> <1995Aug04.113629.2196@illinois.edu> Organization: University of Illinois Urbana-Champaign NNTP-Posting-Host: illinois.edu X-Newsreader: NewsWatcher 2.0b24 Lines: 10 In article <1995Aug04.113629.2196@illinois.edu>, skowalski@illinois.edu (Sergei Kowalski) writes: > The 14 nodes were placed at specific tectonic and microwave relay intersections around the globe. > Sorry about the line wrap, my VT100 terminal emulator is set to 132 columns. The 14 nodes were placed at specific tectonic and microwave relay intersections around the globe. -- Aiko Kim | akim@illinois.edu PGP Key fingerprint: A68E 3AC0 C552 265C "Keep the channels open."